Structural Works
Covered linkways, Singapore
(Jul 2012 — Feb 2013)
Client: Chua Chu Kang Town Council
Scope: Design and Build Covered Walkways and Drop-Off point for Chua Chu Kang Town Council (Batch 04/2012)
Covered linkways, Singapore
(Jul 2010 — Mar 2011)
Client: Hong Kah Town Council
Scope: Design and Build covered walkways, drop-off points, ramps and provision of letter boxes for Hong Kah Town Council (Batch 03/2010)
SBS Bus Depots, Singapore
(May 2010 — Sep 2010)
Client: SBS Transit Ltd
Scope: Proposed addition and alteration works to existing bus depots at Bedok North Avenue 4 and Bukit Batok Street 23
Aluminium Roofing System, Singapore
(Mar 2008 — Dec 2008)
Client: Singapore Polytechnic
Scope: Design, construction & commissioning of Aluminium Roofing System and miscellaneous works
Shelter Housing for Environmental Studies, Singapore
(May 2007 — July 2007)
Client: Republic Polytechnic
Scope: Designed & built sheltered housing for environmental studies for Republic Polytechnic
Science Exhibitions, Singapore
(Dec 2006)
Client: SBS Transit Ltd
Scope: Proposed addition and alteration works to existing bus depots at Bedok North Avenue 4 and Bukit Batok Street 23
Outdoor Physically Science Corner, Singapore
(Dec 2006)
Client: Yumin Primary School
Scope: Design, Conceptualization & Construction of Outdoor Physical Science Corner
Covered Ramp & Covered Linkway at Yishun MRT station, Singapore
(Aug 2006 — Dec 2006)
Client: Land Transport Authority
Scope: Designed & built covered ramp & covered linkway to the existing MRT station at Yishun